Lift procedures
Lift procedures
Initial use to carefully check the hydraulic, electrical system, to ensure that no leakage or no loose line before use.
Lift table legs should be strong support in the solid ground, when necessary, can be transferred using the sleeper surface level of the platform.
When not using the aerial lift platform shall be 1-3 times before loading the operating air.
Load center of gravity in the center of the table.
The activity table fence secured the door before operating.
Power, press the lift button, lift the process at any time press the stop button, the work is completed, press the down button.